Project: Construction of the "Universitetsky" multi-story residential complex in Lipetsk.
Project timeline: 2024.
Client's objective: To obtain comprehensive engineering justification for safe design and construction under complex urban planning conditions.
Work performed: A full cycle of engineering-geodetic, geological, and environmental surveys, including underground utility mapping and field soil testing.
Project highlights: Tight deadlines and high density of existing development, which required the use of modern 3D scanning technologies and prompt coordination of works.
Result: Our surveys made it possible to optimize the foundation design, confirmed by a positive conclusion of the state expert review, and provided the client with budget savings at the zero-cycle stage.