Completed Projects
Moscow Region
Complex of engineering surveys for the construction of utility networks in the industrial territory of Moscow, Novofedorovskoye settlement.
Inspection and assessment of the technical condition of sewerage networks in the village of Voronovo.
Lipetsk Region
Engineering surveys for the construction of the Universitetsky Microdistrict in Lipetsk.
Cadastral works and technical inventory of the AMKODOR-LIPETSK Tractor Plant.
Engineering surveys for the major overhaul of Lipetsk Airport.
Amur Region
Engineering surveys for infrastructure facilities.
Altai Territory
Complex engineering surveys for construction projects.
Republic of Bashkortostan
Engineering surveys for industrial and civil construction.
Republic of Karelia
Engineering surveys for infrastructure development.
Udmurt Republic
Engineering surveys for construction projects.
Penza Region
Engineering surveys for civil and industrial facilities.
Belgorod Region
Full engineering cycle for the modernization of industrial infrastructure of PJSC NLMK.
Tula Region
Complex engineering surveys for construction.
Voronezh Region
Engineering surveys for industrial facilities.
Bryansk Region
Engineering surveys for construction projects.
Rostov Region
Complex engineering surveys for infrastructure.
Ryazan Region
Engineering surveys for civil construction.
Astrakhan Region
Engineering surveys for infrastructure projects.
Samara Region
Engineering surveys for industrial facilities.
Smolensk Region
Engineering surveys for civil construction.
Oryol Region
Engineering surveys for infrastructure projects.
Vladimir Region
Complex engineering surveys for construction.
Kaluga Region
Engineering surveys for industrial and civil facilities.
Republic of Crimea
Engineering surveys for infrastructure development.
Kursk Region
Engineering surveys for construction projects.
Tambov Region
Construction of a water intake unit for the livestock facilities of Cherkizovo Group, Pervomaysky District.
Volgograd Region
Complex engineering surveys for industrial facilities.
Lipetsk Region
Engineering surveys for the construction of the Universitetsky Microdistrict in Lipetsk.
Cadastral works and technical inventory of the AMKODOR-LIPETSK Tractor Plant.
Engineering surveys for the major overhaul of Lipetsk Airport.
Yaroslavl Region, Rostov District
Engineering surveys for civil construction.
Kaluga
Engineering surveys for urban infrastructure.
Belgorod Region, Gubkin
Engineering surveys for industrial facilities.
Tikhoretsk, Krasnodar Territory
Engineering surveys for infrastructure.
Tver Region, Vyshnevolotsky District, Krasnomaysky
Well drilling and water supply construction.
Yaroslavl Region, Rostov District, Petrovskoye
Engineering surveys for construction.
Nizhny Novgorod, Vysokovoltnaya St.
Engineering surveys for urban development.
Kyzyl, Republic of Tuva
Engineering surveys for infrastructure projects.
Saratov
Engineering surveys for tram infrastructure reconstruction.
Tambov
Engineering surveys for civil and industrial facilities.
Tver Region
Construction of two exploration and production wells in the village of Krasnodarsky, Vyshnevolotsky District.
Develop a design project for a sports and recreation complex for Sports School No. 1 in Gubkin, Belgorod Region, and ensure a positive conclusion from the state expertise.
Work performed: geodetic surveys and as-built measurements of all residential and non-residential premises of the building.
Major repair of a road infrastructure element on the Pyatigorsky highway — junction with the Nezlobnaya-Zolskaya highway, km 0+000 – km 3+000, including installation of missing artificial street lighting.
The customer's task is to commission the facility after reconstruction and production expansion in accordance with legal requirements and without delays. To bring the condition of the production site into full legal and technical compliance.
Construction of two exploration and production wells in the village of Krasnodarsky, Vyshnevolotsky District, Tver Region. A well with a telescopic design (369 to 190 mm diameter) was commissioned with a sustained yield of up to 25 m³/h and a water level of 11 m.
The task was to provide legal and technical justification for infrastructure modernization in compliance with legal requirements.
As a result of the project, a complete package of approved documentation with a positive conclusion from the state expert review was obtained, which eliminated the risks of delays during construction.
Obtained comprehensive engineering justification for safe design and construction in complex urban planning conditions.
Completed a full cycle of engineering-geodetic, geological, and environmental surveys, including tracing of underground utilities and field soil testing. The project was completed in a tight timeframe with high density of existing buildings, which required the use of unmanned technologies and prompt coordination of work.
The task was to assess the technical condition of existing structures and obtain up-to-date data on the site for planning further modernization of production capacities.
The customer received a detailed technical report with an assessment of structural wear and recommendations for repairs, which allowed forming an accurate plan and budget for reconstruction.
Assigned task: to obtain accurate and reliable data on the geological conditions and topography of the territory for designing the reconstruction of the airport's critical infrastructure.
A detailed technical report was provided, which formed the basis for design solutions and received a positive expert review conclusion, providing a reliable foundation for reconstruction.
Customer's task: To obtain comprehensive data on the condition of existing structures and the site for the safe reconstruction of a facility with high environmental responsibility.
Based on the conducted research, recommendations were developed that allowed the customer to start reconstruction with minimized risks and obtain a positive conclusion from the state environmental expert review.
It was necessary to assess the technical condition of the automated complex galleries for planning repair work and ensuring the continuity of the technological process.
Based on the results of the survey, a conclusion was prepared on the actual condition of the structures with recommendations for reinforcement, which allowed the customer to draw up a repair work plan and ensure further safe operation of the facility.
Customer's task: To obtain comprehensive data on the coastal territory for designing the reconstruction of the park, taking into account special hydrometeorological conditions and the preservation of the historical landscape.
The obtained data became the basis for design solutions for the park's reconstruction and received a positive expert review conclusion, providing technical justification for the project's implementation.
On behalf of Cherkizovo Group, our company drilled water wells of 219 diameter and constructed water intake facilities for the water supply of a livestock facility complex located in the Pervomaysky district of the Tambov region. A fully functioning water intake facility was commissioned, providing the complex's facilities with a stable water supply within the planned timeframe.
The task was set to create a modern irrigation system to guarantee watering of sown areas and minimize the risks of crop loss due to drought.
The project successfully passed the expert review, which allowed the customer not only to start construction but also to receive a state subsidy, ensuring the project's economic efficiency.
Client's task: To provide a full engineering cycle for the modernization of industrial infrastructure in compliance with deadlines, budget, and industrial safety requirements.
All customer tasks were solved within the specified timeframe strictly within budget, ensuring the infrastructure's readiness for the implementation of new automation and video surveillance systems.