Facility: Reconstruction of sewage treatment facilities in Blagoveshchensk
Client's objective: Obtain comprehensive data on the condition of the existing structures and the site to ensure safe reconstruction of a facility with heightened environmental responsibility.
Work performed: A full range of engineering surveys and a detailed technical inspection of all facilities within the complex.
Project features: The work was carried out at an operating treatment facility in strict compliance with environmental standards and safety requirements.
Result: Based on the surveys conducted, recommendations were developed that enabled the client to begin reconstruction with minimized risks and obtain a positive conclusion from the state environmental expert review.